![]() Engineering Polyurethane Excellence |
PRESS
RELEASE |
|
|
|
|
Pre-coated
light rail reduces installation time for
ALH 'Series-Six' pre-coated polyurethane encapsulated rail, was selected because of its high electrical insulation, vibration resistance, noise reduction, anti-skid and anti-corrosion properties. Plus, it substantially reduces installation time, and civil engineering long-term risk. Rail installation is straightforward with the 'ALH' pre-coated rail system. A concrete base slab is laid to which rails are fixed by adjustable plates. Rail-to-rail bonding wires and the weld infill coating is then completed. Line, level, height, and gauge adjustments are checked, concrete poured around the pre-coated rail, the road constructed up to the rails, and the road level finished to the rail height. Lastly, the final road surface is applied - a 'head-down construction'. Granite
chippings or other anti-slip materials can be included in the top
exposed area of the polyurethane. When the road surface is applied
to the road adjacent to the rail, the anti-slip material can be matched
up to the polymer, ensuring overall road to rail surface skid-resistance,
and cosmetic appeal! Ref: 22-1346 April 2002 |
| PRESS RELEASE INDEX | ||
| For
further information contact help@hyperlast.com,
or telephone the Marketing Department 01663 746518 |